    Safe Work Method Statement (SWMS)

    A SWMS for high-risk construction work — task steps, hazards and controls, with crew sign-on. Required before any high-risk activity starts.

    Medium risk

    Check your contract first. Consider a peer review before sending.

    Open this template

    Copy to clipboard, or download as Word or PDF.

    Format: Document (Word / PDF) · Downloaded 0 times

    When to use this

    • You're doing high-risk construction work (falls 2m+, excavation 1.5m+, near energised electrical, demolition)
    • A principal contractor has asked for your SWMS
    • You need to brief and sign on the crew