NCC 2025 Overview
NewThe National Construction Code explained for tradies — the three volumes, why only Performance Requirements are mandatory (DtS vs Performance Solutions), the staggered NCC 2025 adoption by state, and the growing patchwork of state variations.
NCC Energy & NatHERS
NewThe NCC energy rules explained — the 7-star NatHERS thermal rating and Whole of Home budget for new houses, how NatHERS and the software work, Section J and J1P4 EV/solar readiness for commercial, and what 7 stars demands by climate zone.
Construction Standards Register
NewA working register of the Australian Standards the NCC calls up for residential work — timber framing (AS 1684) and treatment, steel/concrete/masonry, wet-area and external waterproofing (AS 3740/4654), fixings and corrosion, and roofing and wind loads.
Reactive Soils & Footings (AS 2870)
NewHow AS 2870 classifies a residential site by soil reactivity (A, S, M, H1, H2, E, P) and matches the footing system to it — the geotech classification process, footings by class, who is responsible, and the consequences of getting it wrong.
Termite Management (AS 3660)
NewHow termite management works on a new build — the AS 3660.1 standard and NCC requirement across most of Australia, the physical, chemical and baiting system types, the durable notice and inspectable design, and the QLD/NT/TAS variations.
Livable Housing & Accessible Design
NewAccessibility in building — the Livable Housing Silver/Gold/Platinum tiers, the NCC Section H7 livable standard (and which states didn't adopt it), commercial access under AS 1428.1, and the Disability Discrimination Act and Premises Standards.
Building Surveyors & Certifiers
NewThe building surveyor/certifier role explained — how they approve plans and issue permits, the mandatory inspection stages (footing, slab, frame, final), the occupancy permit vs occupation certificate, and the independence and conflict-of-interest rules.
Bushfire BAL & Assessment
NewBuilding in bushfire-prone areas — the six BAL levels and how AS 3959 assessment works, what BAL-19/29/40/FZ demand, the cyclonic wind regions (C/D) and AS 4055, the evidence a certifier needs, and why BAL non-compliance is likely a structural defect.
DA vs CDC & BASIX
NewThe two approval routes explained — a council-assessed Development Application vs a fast code-based Complying Development Certificate, when each applies, the NSW BASIX certificate, and exempt development that needs no approval at all.
State Planning Systems
NewHow Australia's state planning systems work — the NSW SEPP/LEP/DCP hierarchy, VIC's VPP, QLD's Planning Act, SA's Design Code and WA's WAPC — plus council vs state roles and the bushfire, flood and heritage overlays that turn a simple job complex.
Building Approval & Inspection Workflow
NewThe build approval workflow compared across every state — the planning vs building approval distinction, the per-state permit and certifier process, the footings-slab-frame-final inspection spine, and the consequences of unapproved or failed work.
Dividing Fences, Flood & Boundary Walls
NewThe boundary rules tradies hit daily — the 50/50 dividing-fence principle and notice process (NSW/VIC/QLD), building on flood-overlay land (floor levels, freeboard, flood-resistant materials), and boundary/party-wall obligations.
Aboriginal Cultural Heritage & EPBC
NewManaging Aboriginal and Torres Strait Islander cultural heritage on a build — the per-state frameworks (NSW AHIP, VIC CHMP, QLD duty of care, WA), the EPBC Act MNES triggers, and the stop-work protocol when artefacts or remains are found.
C&D Waste & Asbestos Disposal
NewConstruction and demolition waste explained — the per-state landfill levies (and why you price per state), how to package, transport and dispose of asbestos waste lawfully, the records to keep, and the steep penalties for illegal dumping.
Contaminated Land, PFAS & Vegetation Clearing
NewWhat to do when a build hits contaminated soil or protected vegetation — the on-site stop-and-isolate steps, the duty to notify the EPA (NSW/VIC/WA), the ASC NEPM staged investigation, PFAS handling, and native-vegetation clearing permits and penalties.
EV, Utes, Site Noise & Green Star
NewThree converging green-site topics for tradies — the 2025-26 electric utes and vans, the shifting FBT and LCT incentives (PHEVs lose the FBT exemption from April 2025), construction noise hours and AS 2436, and Green Star/NABERS obligations.