Essential Reading
Residential Contracts & the ACL
NewWhat a compliant residential contract needs, quote vs estimate, the ACL consumer guarantees you cannot exclude, and the 2023 unfair-contract-terms reforms that turn dodgy boilerplate into a six-figure penalty risk — even for a one-man band.
Residential Contract Requirements by State
NewMandatory residential contract content, deposit caps and cooling-off by state — NSW 10%, VIC 10/5%, QLD 20/10/5%, SA $1,000-or-5%, and WA's key exception (no statutory cooling-off). Plain-English for builders.
Contract Types & Standard Forms
NewThe four building contract types and what each risks, the HIA/MBA/AS 4000/AS 4902 standard forms, and the AS 4000 traps for subbies on back-to-back terms — variations give money not time, and the 28-day EOT bar.
Variations — Getting Them in Writing
NewWhy an unapproved variation is the hardest thing to get paid for — oral vs written variations, what AS 4000 and HIA/MBA require, the prevention principle that shields you on delay, and the records and workflow that make a claim stick.
Statutory Warranties & Defects
NewThe defect safety nets that cannot be excluded — statutory warranty periods by state (NSW/ACT/TAS 6+2, QLD 6+1, VIC up to 10 years), the implied warranties, how ACL guarantees override conflicting clauses, who pays to rectify, and VIC's DBDRV step.
Building Dispute Tribunals
NewHow the state building tribunals work — the regulator/conciliation pre-step (Fair Trading, DBDRV, QBCC), the money limits (NCAT $500k, QCAT no domestic limit, VCAT uncapped), response deadlines, and what they can order.
Defective Work & Complaints
NewHow a building defect complaint works — the ACL guarantees, minor vs major remedies (repair vs refund/compensation), giving yourself the chance to fix, the QBCC/VBA/Fair Trading rectification powers, and why you can't charge to fix your own defective work.
Scope Creep & Deposit Disputes
NewWhere a builder stands on deposits and scope creep — the verified deposit caps by state, when you can keep a deposit (prove the costs), how tribunals treat undocumented extras (quantum meruit), and the clauses that get struck down.
Handling Complaints & Reviews
NewHow to handle a customer complaint before it becomes a tribunal case — the 5-stage process, the ACL minor-vs-major remedy split (and the delay trap), responding to negative reviews without defaming anyone, and when to fix free vs stand firm.
Engaging Subcontractors
NewBecoming a head contractor when you put a subbie on — what the subbie agreement must cover, the sham-contracting risk from the engaging side, your non-delegable PCBU safety duty, and the SOP cash-flow trap that sinks first-timers.
Managing Customer Expectations
NewHow to manage customer expectations and avoid disputes — the five things clear expectations cover, drawing the scope line, "no surprises" updates, treating every change as a written mini-agreement, realistic timelines, and spotting drift before it becomes an argument. With scripts.
Difficult & Abusive Customers
NewHow tradies handle aggressive or abusive customers safely — the three bands of behaviour, de-escalation, setting one clear boundary, resisting scope-creep pressure, when and how to walk off a job, lone-worker safety, and looking after yourself afterwards. Guidance only.
Documenting Your Work
NewThe records that win construction disputes — contemporaneous site diaries, properly shot and linked photos, as-built drawings, and variation and defect logs that all reference each other — and how to keep them adjudication-ready for a Security of Payment claim. Guidance only.