Skip to main content

    The 2025-26 financial year has ended — the EOFY checklist still helps with July lodging and your June BAS. EOFY checklist →

    Write a method statement a main contractor will actually accept.

    For subbies doing their first principal-contractor job who've been handed a blank template. Sequence of work, hazards, controls and sign-off grid in one PDF.

    A method statement describes how you'll carry out a job safely — the sequence of work, the hazards, the controls, and the emergency procedures. Most main contractors won't let you start without one.

    Fill in the 9 steps below, preview your document on screen, then download the PDF. No charge, no signup, no catch.

    Disclaimer: This tool helps you create a method statement for your job. It is a starting point — you must review and adapt it to your specific site conditions. SiteKiln does not provide health and safety consultancy. If your job involves complex or high-risk work, get professional advice.

    Step 1: Project Details

    0/200

    1 / 9

    What the law actually says

    • •The model Work Health and Safety (WHS) Act, administered by your state or territory WHS regulator (e.g. SafeWork NSW, WorkSafe Victoria, Workplace Health and Safety Queensland).

    What to do next